How to calculate the usage of building templates

1、Rules for the calculation of the quantities of prefabricated reinforced concrete member formworks 1. The quantities of prefabricated reinforced concrete formworks are calculated in m3 according to the concrete solid volume unless otherwise specified. 2. Small tank is calculated in m3 according to its external volume. 3. Prefabricated pile tip is based on virtual volume (excluding the virtual volume of pile tip)

Now, some customers often ask how to calculate the usage of building templates. Now, Jiangsu and Qisheng Wood Industry Co., Ltd. will give you some conventional calculation methods for your reference: 

 Calculation rules for the quantities of prefabricated reinforced concrete component formworks 

1. The quantities of prefabricated reinforced concrete formworks, unless otherwise specified, are calculated in cubic meters of concrete solid volume. 

2. Small tank is calculated in m3 according to its external volume. 

3. Prefabricated pile tip shall be calculated according to the virtual volume (excluding the virtual volume of pile tip) 

II. Calculation rules for the quantities of reinforced concrete formwork for structures 

1. Unless otherwise specified, the quantities of formwork for structures shall be calculated according to the relevant provisions of I and II respectively according to the different types of cast-in-place, prefabricated and component. 

2. Large tanks, etc. shall be calculated according to relevant provisions of foundation, wall, slab, beam, column, etc. and set with corresponding quota items. 

3. Chimney, water tower body, storage bin, etc. constructed by hydraulic sliding steel formwork shall be calculated in m3 according to concrete volume. Prefabricated inverted conical water tower tank shell formwork is calculated in m3 by concrete volume. 4. Prefabricated inverted conical water tower tank shell is assembled, lifted and put in place, which is calculated by seats according to different volumes. 

Rules for calculation of quantities of reinforced concrete and cast-in-place concrete formworks 

1. Quantities of cast-in-place concrete and reinforced concrete formworks are calculated in m2 based on the area of the contact surface between concrete and formwork, unless otherwise specified. 

2. The formwork height of cast-in-place reinforced concrete columns, beams, slabs and walls (that is, the height from outdoor floor to slab bottom or from slab surface to slab bottom) shall be within 3.6m, exceeding 3 For the part above 6m, the supporting work quantity shall be added according to the part beyond 6m. 

3. Holes with a single hole area of less than 0.3m2 in cast-in-place reinforced concrete walls and slabs will not be deducted, and the side wall formwork of the hole will not be increased; If the area of a single hole is more than 0.3 m2, it shall be deducted, and the area of the side wall formwork of the hole shall be included in the work quantity of the wall and slab formwork. 

4. Cast-in-situ reinforced concrete frame shall be calculated according to the relevant provisions of beams, slabs, columns and walls, attached with wall columns, and incorporated into the calculation of quantities in the wall. 

5. If the height of the cup mouth of the cup foundation is greater than the length of the big side of the cup mouth, the cup foundation quota item shall be raised. 

6. The overlapping part of the connection between column and beam, column and wall, beam and beam, as well as the beam head and slab head extending into the wall, are not calculated for the formwork area. 

7. The exposed surface of the structural column shall be calculated according to the exposed part in the drawing. The formwork area is not calculated for the contact surface between the constructional column and the wall. 

8. Cast-in-situ reinforced concrete cantilever slab (awning, balcony) is calculated according to the horizontal projected area of the size of the overhanging part in the drawing. The corbel beam and slab edge formwork protruding out of the wall will not be calculated separately. 

9. Cast-in-situ reinforced concrete stairs shall be calculated based on the horizontal projected area of the exposed surface size in the drawing, and the area of stairwell less than 500mm shall not be deducted. The side formwork of stair steps, step plate platform beams, etc. will not be calculated separately. 

10. The concrete step does not include the ladder belt, which is calculated according to the horizontal area of the step size shown in the figure. The formwork area is not calculated separately on both sides of the step end. 

11. The cast-in-place concrete small tank is calculated according to the volume of the outer part of the component, and the formwork inside, outside and bottom of the tank is not calculated separately.

Click:
Like | 0
share
How to calculate the usage of building templates
1、Rules for the calculation of the quantities of prefabricated reinforced concrete member formworks 1. The quantities of prefabricated reinforced concrete formworks are calculated in m3 according to the concrete solid volume unless otherwise specified. 2. Small tank is calculated in m3 according to its external volume. 3. Prefabricated pile tip is based on virtual volume (excluding the virtual volume of pile tip)
Long by picture save/share

How to calculate the usage of building templates

1、Rules for the calculation of the quantities of prefabricated reinforced concrete member formworks 1. The quantities of prefabricated reinforced concrete formworks are calculated in m3 according to the concrete solid volume unless otherwise specified. 2. Small tank is calculated in m3 according to its external volume. 3. Prefabricated pile tip is based on virtual volume (excluding the virtual volume of pile tip)

Now, some customers often ask how to calculate the usage of building templates. Now, Jiangsu and Qisheng Wood Industry Co., Ltd. will give you some conventional calculation methods for your reference: 

 Calculation rules for the quantities of prefabricated reinforced concrete component formworks 

1. The quantities of prefabricated reinforced concrete formworks, unless otherwise specified, are calculated in cubic meters of concrete solid volume. 

2. Small tank is calculated in m3 according to its external volume. 

3. Prefabricated pile tip shall be calculated according to the virtual volume (excluding the virtual volume of pile tip) 

II. Calculation rules for the quantities of reinforced concrete formwork for structures 

1. Unless otherwise specified, the quantities of formwork for structures shall be calculated according to the relevant provisions of I and II respectively according to the different types of cast-in-place, prefabricated and component. 

2. Large tanks, etc. shall be calculated according to relevant provisions of foundation, wall, slab, beam, column, etc. and set with corresponding quota items. 

3. Chimney, water tower body, storage bin, etc. constructed by hydraulic sliding steel formwork shall be calculated in m3 according to concrete volume. Prefabricated inverted conical water tower tank shell formwork is calculated in m3 by concrete volume. 4. Prefabricated inverted conical water tower tank shell is assembled, lifted and put in place, which is calculated by seats according to different volumes. 

Rules for calculation of quantities of reinforced concrete and cast-in-place concrete formworks 

1. Quantities of cast-in-place concrete and reinforced concrete formworks are calculated in m2 based on the area of the contact surface between concrete and formwork, unless otherwise specified. 

2. The formwork height of cast-in-place reinforced concrete columns, beams, slabs and walls (that is, the height from outdoor floor to slab bottom or from slab surface to slab bottom) shall be within 3.6m, exceeding 3 For the part above 6m, the supporting work quantity shall be added according to the part beyond 6m. 

3. Holes with a single hole area of less than 0.3m2 in cast-in-place reinforced concrete walls and slabs will not be deducted, and the side wall formwork of the hole will not be increased; If the area of a single hole is more than 0.3 m2, it shall be deducted, and the area of the side wall formwork of the hole shall be included in the work quantity of the wall and slab formwork. 

4. Cast-in-situ reinforced concrete frame shall be calculated according to the relevant provisions of beams, slabs, columns and walls, attached with wall columns, and incorporated into the calculation of quantities in the wall. 

5. If the height of the cup mouth of the cup foundation is greater than the length of the big side of the cup mouth, the cup foundation quota item shall be raised. 

6. The overlapping part of the connection between column and beam, column and wall, beam and beam, as well as the beam head and slab head extending into the wall, are not calculated for the formwork area. 

7. The exposed surface of the structural column shall be calculated according to the exposed part in the drawing. The formwork area is not calculated for the contact surface between the constructional column and the wall. 

8. Cast-in-situ reinforced concrete cantilever slab (awning, balcony) is calculated according to the horizontal projected area of the size of the overhanging part in the drawing. The corbel beam and slab edge formwork protruding out of the wall will not be calculated separately. 

9. Cast-in-situ reinforced concrete stairs shall be calculated based on the horizontal projected area of the exposed surface size in the drawing, and the area of stairwell less than 500mm shall not be deducted. The side formwork of stair steps, step plate platform beams, etc. will not be calculated separately. 

10. The concrete step does not include the ladder belt, which is calculated according to the horizontal area of the step size shown in the figure. The formwork area is not calculated separately on both sides of the step end. 

11. The cast-in-place concrete small tank is calculated according to the volume of the outer part of the component, and the formwork inside, outside and bottom of the tank is not calculated separately.

Click:
Like | 0
share
How to calculate the usage of building templates
1、Rules for the calculation of the quantities of prefabricated reinforced concrete member formworks 1. The quantities of prefabricated reinforced concrete formworks are calculated in m3 according to the concrete solid volume unless otherwise specified. 2. Small tank is calculated in m3 according to its external volume. 3. Prefabricated pile tip is based on virtual volume (excluding the virtual volume of pile tip)
Long by picture save/share

198-2572-7555

Hotline


Email: hqs19825727555@163.com

Address: Machang Village Park, Qingyihu Town, Shuyang County, Jiangsu Province

HOME          ABOUT US          CASES          PRODUCTS          NEWS          CONTACT US

ROCCESS         CLIENTS

Copyright © 2023 Jiangsu Heqisheng Wood Industry Co., Ltd. All rights reserved  

The phone number is 159-2572-7555

Email: hqs19825727555@163.com

Address: No.1 Machang Village Park, Qingyihu Town, Shuyang County, Jiangsu Province

Copyright © 2023 Jiangsu Heqisheng Wood Industry Co., LTD. All Rights Reserved

 

添加微信好友,详细了解产品
使用企业微信
“扫一扫”加入群聊
复制成功
添加微信好友,详细了解产品
我知道了
626969com澳门老葡萄京官网 document.write ('');