Ten working conditions for building formwork

Divide the construction area and section of the project to be built: reasonably determine the flow section of building formwork construction according to the form, characteristics and site conditions of the project structure, so as to reduce the investment of building formwork, increase the number of turnover, balance the work volume of process engineering (reinforcement, building formwork, concrete process), and ensure the project progress.

The construction of building formwork must first complete the ten working conditions of building formwork: 

1. Divide the construction area and section of the project to be built: reasonably determine the flow section of building formwork construction according to the form, characteristics and site conditions of the project structure, so as to reduce the investment of building formwork, increase the number of turnover, balance the work volume of process engineering (reinforcement, building formwork, concrete process), and ensure the project progress. 

2. Design the building formwork according to the engineering structure design drawing to ensure the strength, rigidity and stability. 

3. Draw a complete set of architectural formwork design drawings, including: architectural formwork layout plan, assembly drawing, node detail drawing. Determine the layout plan and support layout of architectural formwork. Design the layout plan according to the size and number of beams, plates, columns, etc. according to the general drawing, and mark different models and sizes of single architectural formwork layout plan, vertical and horizontal keel specification, quantity and arrangement size; The form and spacing of column hoops; The model and spacing of the vertical support, lateral support, and horizontal tension connector of the support system. 

4. Drawing and checking calculation: on the basis of the layout of the building template plate and the layout of the support system, the strength, rigidity and stability shall be strictly checked and calculated. After passing the check, a complete set of building template design drawings shall be drawn, including: the layout of the building template plate, the block diagram, the assembly drawing, the node detail drawing, and the processing drawing of parts and non-standard splices. 

5. After the setting out of axis, building template line, door and window opening line and elevation line, the horizontal control elevation shall be measured to the reserved dowel bar or other transition measuring points, and the pre-inspection procedures shall be completed. 

6. In order to prevent the mortar from escaping from the lower opening of the building formwork, the bottom of the cushion of the building formwork shall be padded with a 20mm thick sponge strip before the installation of the building formwork. If the bottom is seriously uneven, the 1:3 cement mortar shall be used along the inner edge of the building formwork first, and the leveling layer shall be accurately leveled according to the given elevation line (the leveling layer shall not extend into the wall). The outer root of the outer wall and the outer column shall be set with the building formwork cushion timber square according to the elevation line, and the leveling mortar shall be horizontally crossed to ensure the accurate elevation and no mortar leakage. 

7. Set the positioning benchmark of the building formwork (protective layer), that is, weld the horizontal strut according to the thickness of the protective layer according to the building formwork line at the place 50~80mm from the ground on the main reinforcement of the wall and column to prevent the horizontal displacement of the building formwork. 

8. The binding of wall and column reinforcement is completed; The water and electricity pipelines, reserved holes and embedded parts have been installed, the cushion blocks of the reinforcement protective layer have been bound, and the concealed inspection procedures have been completed. 

9. For the assembly of building formwork, all panels must be firmly fixed on the keel. 

10. For the assembled building formwork, check whether its diagonal, flatness, external dimension and firmness are effective according to the drawing requirements; The release agent shall be painted and placed separately.


Click:
Like | 0
share
Ten working conditions for building formwork
Divide the construction area and section of the project to be built: reasonably determine the flow section of building formwork construction according to the form, characteristics and site conditions of the project structure, so as to reduce the investment of building formwork, increase the number of turnover, balance the work volume of process engineering (reinforcement, building formwork, concrete process), and ensure the project progress.
Long by picture save/share

Ten working conditions for building formwork

Divide the construction area and section of the project to be built: reasonably determine the flow section of building formwork construction according to the form, characteristics and site conditions of the project structure, so as to reduce the investment of building formwork, increase the number of turnover, balance the work volume of process engineering (reinforcement, building formwork, concrete process), and ensure the project progress.

The construction of building formwork must first complete the ten working conditions of building formwork: 

1. Divide the construction area and section of the project to be built: reasonably determine the flow section of building formwork construction according to the form, characteristics and site conditions of the project structure, so as to reduce the investment of building formwork, increase the number of turnover, balance the work volume of process engineering (reinforcement, building formwork, concrete process), and ensure the project progress. 

2. Design the building formwork according to the engineering structure design drawing to ensure the strength, rigidity and stability. 

3. Draw a complete set of architectural formwork design drawings, including: architectural formwork layout plan, assembly drawing, node detail drawing. Determine the layout plan and support layout of architectural formwork. Design the layout plan according to the size and number of beams, plates, columns, etc. according to the general drawing, and mark different models and sizes of single architectural formwork layout plan, vertical and horizontal keel specification, quantity and arrangement size; The form and spacing of column hoops; The model and spacing of the vertical support, lateral support, and horizontal tension connector of the support system. 

4. Drawing and checking calculation: on the basis of the layout of the building template plate and the layout of the support system, the strength, rigidity and stability shall be strictly checked and calculated. After passing the check, a complete set of building template design drawings shall be drawn, including: the layout of the building template plate, the block diagram, the assembly drawing, the node detail drawing, and the processing drawing of parts and non-standard splices. 

5. After the setting out of axis, building template line, door and window opening line and elevation line, the horizontal control elevation shall be measured to the reserved dowel bar or other transition measuring points, and the pre-inspection procedures shall be completed. 

6. In order to prevent the mortar from escaping from the lower opening of the building formwork, the bottom of the cushion of the building formwork shall be padded with a 20mm thick sponge strip before the installation of the building formwork. If the bottom is seriously uneven, the 1:3 cement mortar shall be used along the inner edge of the building formwork first, and the leveling layer shall be accurately leveled according to the given elevation line (the leveling layer shall not extend into the wall). The outer root of the outer wall and the outer column shall be set with the building formwork cushion timber square according to the elevation line, and the leveling mortar shall be horizontally crossed to ensure the accurate elevation and no mortar leakage. 

7. Set the positioning benchmark of the building formwork (protective layer), that is, weld the horizontal strut according to the thickness of the protective layer according to the building formwork line at the place 50~80mm from the ground on the main reinforcement of the wall and column to prevent the horizontal displacement of the building formwork. 

8. The binding of wall and column reinforcement is completed; The water and electricity pipelines, reserved holes and embedded parts have been installed, the cushion blocks of the reinforcement protective layer have been bound, and the concealed inspection procedures have been completed. 

9. For the assembly of building formwork, all panels must be firmly fixed on the keel. 

10. For the assembled building formwork, check whether its diagonal, flatness, external dimension and firmness are effective according to the drawing requirements; The release agent shall be painted and placed separately.


Click:
Like | 0
share
Ten working conditions for building formwork
Divide the construction area and section of the project to be built: reasonably determine the flow section of building formwork construction according to the form, characteristics and site conditions of the project structure, so as to reduce the investment of building formwork, increase the number of turnover, balance the work volume of process engineering (reinforcement, building formwork, concrete process), and ensure the project progress.
Long by picture save/share

198-2572-7555

Hotline


Email: hqs19825727555@163.com

Address: Machang Village Park, Qingyihu Town, Shuyang County, Jiangsu Province

HOME          ABOUT US          CASES          PRODUCTS          NEWS          CONTACT US

ROCCESS         CLIENTS

Copyright © 2023 Jiangsu Heqisheng Wood Industry Co., Ltd. All rights reserved  

The phone number is 159-2572-7555

Email: hqs19825727555@163.com

Address: No.1 Machang Village Park, Qingyihu Town, Shuyang County, Jiangsu Province

Copyright © 2023 Jiangsu Heqisheng Wood Industry Co., LTD. All Rights Reserved

 

添加微信好友,详细了解产品
使用企业微信
“扫一扫”加入群聊
复制成功
添加微信好友,详细了解产品
我知道了
aoa体育平台千亿游戏平台 document.write ('');